All BMW I Dealerships To Install DC Fast Charger, BMW Malaysia To Expand EV Infrastructure

  • News
  • All BMW I Dealerships To Install DC Fast Charger, BMW Malaysia To Expand EV Infrastructure

All BMW I Dealerships To Install DC Fast Charger, BMW Malaysia To Expand EV Infrastructure

Upon launching the BMW iX and announcing the soon arrival of the BMW i4 and BMW iX3 , BMW Group Malaysia has also announced their plans to expand the EV charging network in Malaysia rapidly.
BMW Group Malaysia has their eyes set on rapidly expanding the BMW i dealer network to key cities across the country.
DC Fast Chargers will also be installed at all BMW i dealers for public use to further accelerate the availability of charging infrastructures in Malaysia, along with Rapid-charging DC Chargers to be made available for quick on-the-go charging at selected dealerships nationwide.
Hans de Visser, Managing Director of BMW Group Malaysia said, “We look forward to reigniting local interest and uptake for electromobility, in foresight of the much-discussed upcoming Low Carbon Mobility Blueprint.
We have partnered with Greentech Malaysia from the very beginning to grow the local charging infrastructure network as part of our key strategies to shift Malaysia towards low carbon mobility future.
Moving forward, we aim to give Malaysians the confidence to choose electric for their next –or even first, drive. In fact, there are more plans set to activate in the upcoming months that will encourage a positive reception of this future-focused way of mobility, of which we hope will also be strengthened by the upcoming revision of government policies towards electromobility.”
Arif Chan
With a deep interest and relevant experiences in the automotive industry, Arif writes about everything automotive. His employment history includes being an automotive production engineer, a highway project engineer, an alternative-fuel researcher, and a motoring journalist. In case you'd like to nerd out, you can check out his research paper here: https://aiche.onlinelibrary.wiley.com/doi/10.1002/ep.13749